Doornkop JSE: R208.40 +0.73% NYSE:$11.37 +4.31% GOLD:$2 790/oz +1.10% GOLD:R1 654 712/kg +0.88% USD:ZARR18.45 -0.21% At 17:19pm, 30 Jan 2025 Home » Operations » South Africa » Underground operations » Doornkop Overview Doornkop is a deep-level, single-shaft operation in Gauteng, some 30km west of Johannesburg, on the northern rim of the Witwatersrand Basin. While a mature operation, Doornkop still has 15 years life-of-mine remaining and is focused on narrow-reef conventional mining of the gold-bearing conglomerate South Reef. Ore is processed at the Doornkop plant, which uses the carbon-in-pulp process to extract gold. As at 30 June 2024 Gold Resource: 7.5Moz Gold Reserve: 1.9Moz LoM: 18 years Operating statistics FY24 Production 3 470kg / 111 562oz Grade 4.26g/t Workforce 4 152 All-in sustaining cost US$1 716/oz Operating performance FY24 Gold production for FY24 at 3 470kg (111 562oz) was 18% lower than the 4 213kg (135 451oz) for the previous year, this was, however, in line with planning. Doornkop experienced face-length challenges during the June 2024 quarter affecting production, ore milled for the year was 9% lower at 815 000 tonnes for FY24 (FY23: 898 000 tonnes). During FY23 Doornkop embarked on mill clean-up operations that boosted the recovered grade, which was not repeated in FY24, this was a contributor to the 9% decrease in grade to 4.26g/t (FY23: 4.69g/t). The lower gold production reflected in revenue, down 4% to R4 198 million (FY23: R4 384 million) despite a 17% increase in the gold price. The gold price received increased to R1 210 252/kg for FY24 from R1 035 665/kg in the previous year. Cash operating costs increased by only 2% to R3 054 million (FY23: R2 987 million) mainly due to annual wage and electricity tariff increases. Capital expenditure decreased 4% to R687 million from R716 million in FY23, mainly on major project capital. A total of R336 million was spent for ongoing development. Operating free cash flow of R457 million was recorded in FY24, 33% lower than the R682 million in FY23, a direct result of the lower production. Our focus area in FY25 Focus on safety remains a top priority for the management team, with continued focus on the 207/212 level extension and associated infrastructure to ensure the operation’s future. ESG statistics Lost-time injury frequency rate 7.58 per million hours worked (FY23: 5.94) Water intensity (/tonne treated) 1.06Ml (FY23: 2.05Ml) Energy intensity (/tonne treated) 0.31GWh (FY23: 0.25GWh) GHG intensity (/tonne treated) 0.31t CO2e (FY23: 0.27t CO2e) Local economic development R5m (FY23: R7m) SLP Doornkop SLP 2018 -2022 (English) Doornkop Tel: 011 278 6679 Valkfontein 238-Iq, Soweto, 1829, Gauteng, South Africa