Kusasalethu

  • JSE: R157.33 0.22%
  • NYSE:$8.30 -4.49%
  • GOLD:$2 611/oz +0.98%
  • GOLD:R1 532 580/kg +0.54%
  • USD:ZARR18.26 -0.41%
  • At 05:24am, 19 Dec 2024

Overview

Kusasalethu is a mature, deep-level mine, 90km west of Johannesburg, near the Gauteng North-West provincial border.

Mine infrastructure comprises twin vertical and twin sub-vertical shaft systems. Conventional mining methods are used in a sequential grid layout with mining depths reaching 3 388m below surface where the Ventersdorp Contact Reef is the primary orebody exploited. Ore mined is treated at the Mponeng plant.

As at 30 June 2023

  • Gold Resource: 3.50Moz
  • Gold Reserve: 0.40Moz
  • LoM: 3 years

Operating statistics FY23

Production

3 460kg / 111 242oz

Grade

6.10g/t

Workforce

3 970

All-in sustaining cost

US$1 871/oz

Operating performance FY23

Kusasalethu was affected by lower than anticipated grades in some of its very high grade mining areas as well as numerous mining-related challenges that reflected in the recovered grade. The operation achieved a recovered grade of 6.10g/t for FY23 some 19% lower than the 7.52g/t recorded in FY22. Tonnes milled was also lower by 7% at 567 000 tonnes (FY22: 607 000 tonnes) and ultimately reflected in the gold produced for FY23 at 3 460kg (111 242 oz), 24% lower than the 4 567kg (146 833 oz) achieved in FY22.

The lower production reflected in the revenue, being down 13% to R3 621 million from R4 139 million in FY22. The effect of the lower gold production was however partially offset by a 15% rise in the gold price received to R1 040 274/kg in FY23 (FY22: R902 634/kg).

Cash operating costs were 7% higher at R3 311 million (FY22: R3 098 million), mainly due to annual wage and electricity tariff increases. Capital expenditure rose 20% to R253 million (FY22: R210 million), mainly for ongoing development. Operating free cash flow dropped 93% to R57 million mainly reflecting the lower production and was disappointing when compared to the R831 million achieved in FY22.

OUTLOOK FOR FY24

Continued focus on improving safety performance while achieving production targets. Exploration work is underway to firm up the orebody. Production guidance for FY24 is 119 600oz to 124 700oz.

ESG statistics

Lost-time injury frequency rate

7.71 per million hours worked (FY22: 8.11)

Water intensity (/tonne treated)

4.82Ml (FY22: 4.74Ml)

Energy intensity (/tonne treated)

1.04GWh (FY22: 1.01GWh)

GHG intensity
(/tonne treated)

1.09t CO2e (FY22:1.09t CO2e)

Local economic development

R25m (FY22: R8m)

Kusasalethu

Tel: 018 782 9348

Elandsrand Dr, Carletonville, 2500,
Gauteng, South Africa